PROJECT PORTFOLIO

Department of Education

  • Received, re-delivered and installed 2,550 workstations.
  • Received, re-delivered and installed all other product (chairs, files, shelving, media walls and conference room tables).
  • 350+ Tractor trailers of product received and shipped via our warehouse.
  • Completed installation on an accelerated schedule.
  • Allsteel Terrace, Paoli, Goelst, Kimball Reasons, Definitions and Footprint Traxx&Tiles

Food and Drug Administration

  • Received at site and installed 5,900 workstations.
  • Received at site and installed all ancillary furniture (files, conference tables & seating).
  • Worked performed in multiple buildings on campus.
  • Herman Miller Passage and Ethospace

USDA PP3

  • Received, re-delivered and installed 1,100 workstations.
  • Utilized “pre-delivery prepping process”
    • Product delivered to site in organized bin boxes on wheels, thereby saving dock time.
    • Product is already unboxed, allowing for a faster install.
    • Minimum trash/debris on site.
  • Allsteel Stride

Georgetown University Science Center

  • Received, re-delivered and installed 206 workstations and 43 offices.
  • Received, re-delivered and placed 1,400 pieces of seating and ancillary furniture.
  • Completed installation on an accelerated schedule.
  • Multiple manufactures

U.S. Treasury

  • Received, re-delivered and installed 1,000 workstations.
  • Kimball CETRA

Internal Revenue Service

  • Received at site and installed 4,800 workstations.
  • Worked performed in multiple buildings and floors simultaneously.
  • Extremely fast paced schedule.
  • Herman Miller AO2

Pentagon Renovation - Wedges 1,2,3,4 & 5

  • Received at site and installed 7,200 workstations.
  • All unloads occurred at night.
  • Multiple shifts to accommodate accelerated schedule.
  • Security clearance needed.
  • Herman Miller Ethospace, AO2 and Passage

NavSea Command -Washington Navy Yard

  • Received, re-delivered and installed 3,400 workstations.
  • Relocated 1,600 existing workstations.
  • Installation in 5 buildings.
  • Multiple floors installed concurrently throughout project.
  • Construction delays demanded extreme flexibility by our management and installation teams, to meet accelerated schedules.
  • Herman Miller Ethospace




© 2023 Systems Connections of Maryland
8839 Greenwood Place, Savage, MD 20763
410-880-3161 | 301-470-3286 | FAX: 301-470-4052
Home | About | Install & Reconfiguration | Warehouse & Storage | Other Services | Careers | Employees | Contact

Website Designed by Digital Doorway Designs